AgileSherpas AgileSherpas
  • Industries

    Discover how AgileSherpas tailors marketing agility to meet the unique challenges of your industry.

    • Financial Services
    • Banking
    • Insurance
    • Pharmaceuticals
    • Healthcare
  • Services

    Explore support options that are tailored to meet you wherever you are on your climb.

    • Agile Marketing Training
    • Agile Coaching
    • Agile Transformation
  • Courses

    Browse our pioneering Agile marketing courses

    • Intro to Agile Marketing
    • Agile Marketing Fundamentals
    • Agile Marketing Leadership
  • Case Studies

    Learn from the stories of marketers already on the road to process improvement.

    • Charles River Laboratories
    • M&T Bank
    • Quadient
    • Daiichi Sankyo
    • Healthcare Organization
    • Insurance & Financial Services Company
    • Scientific Solutions Company
  • Resources
    • The Ropes Community
    • The Agile Marketing Credo
    • The Agile Marketing Edge Podcast
    • Beyond the Edge Newsletter
    • Blog
    • Webinars & Events
    • Guides & eBooks
    • Checklists & Workshops

    Featured Resource

    SOAM 25-26 Report Cover Resources Section

    State of Agile Marketing

    Learn from 9 years of study on how marketers are increasing their agility.

    Download Report
  • About
  • Contact Us
    AgileSherpas Blog
      • marketing agility
      • Teams
      • Organizations
      • Education
      • enterprise
      • Articles
      • Individuals
      • Solution
      • Transformation
      • Leadership
      • Getting Started
      • business agility
      • agile management
      • going agile
      • Frameworks
      • agile mindset
      • Agile Marketing Tools
      • Agile Marketers
      • agile marketing journey
      • organizational alignment
      • People
      • Selection
      • (Featured Posts)
      • strategy
      • Metrics and Data
      • Resources
      • agile journey
      • Kanban
      • Why Agile Marketing
      • agile project management
      • Agile Leadership
      • self-managing team
      • AI
      • Meetings
      • Scrum
      • agile adoption
      • scaled agile marketing
      • tactics
      • scaled agile
      • Agile Meetings
      • agile marketing training
      • agile takeaways
      • enterprise marketing agility
      • agile coach
      • Scrumban
      • agile marketing planning
      • state of agile marketing
      • team empowerment
      • Individual
      • Intermediate
      • Team
      • agile marketing mindset
      • agile plan
      • Agile Marketing Teams
      • Videos
      • agile marketing
      • agile transformation
      • kanban board
      • Agile Marketing Terms
      • traditional marketing
      • Agile Marketing Glossary
      • FAQ
      • agile marketing methodologies
      • agile teams
      • CoE
      • Scrumban
      • agile
      • agile marketer
      • agile marketing case study
      • agile marketing coaching
      • agile marketing leaders
      • agile marketing metrics
      • agile pilot
      • agile sales
      • agile team
      • agile work breakdown
      • cycle time
      • employee satisfaction
      • marketing value stream
      • marketing-analytics
      • remote teams
      • sprints
      • throughput
      • work breakdown structure
      • News
      • agile brand
      • agile marketing books
      • agile marketing pilot
      • agile marketing transformation
      • agile review process
      • agile team charter
      • cost of delay
      • hybrid framework
      • pdca
      • remote working
      • scrum master
      • stable agile teams
      • stand ups
      • startups
      • team charter
      • team morale
      • user story
      • value stream mapping
      • visual workflow
    marketing agility 11 min read

    WIP it Good: The Many Powers of WIP Limits for Agile Marketing

    Andrea Fryrear Andrea Fryrear

    Key Takeaways

    • WIP limits help Agile marketing teams stop starting too much work and start finishing more of the work that matters.
    • A WIP limit caps how much work can be in progress at one time, either across the whole workflow, within a specific stage, or for an individual team member.
    • For marketing teams, WIP limits can apply to work like campaigns, blog posts, landing pages, emails, creative assets, reports, experiments, and approvals.
    • Setting WIP limits is usually an educated guess at first. Teams should start with realistic limits, watch where work gets stuck, and adjust the limits over time.
    • When a WIP limit is reached, the team should focus on moving existing work forward instead of pulling in more work.
    • WIP limits help marketing teams reduce context switching, identify bottlenecks, improve flow, and deliver work more consistently.
    • WIP limits can work in Kanban, Scrum, or Scrumban, but they require shared agreement and leadership support to survive real-world interruptions.
    • Team WIP limits protect the flow of work through the system, while personal WIP limits help individual marketers protect focus.

    Work in Progress (WIP) limits are curious things. Their core concept is paradoxical if you boil it down to its essence:

    Get more done in the future by doing less right now.

    A little counterintuitive, sure, but WIP limits are enormously powerful when put into action on an Agile marketing team or in other functions of an Agile business.

    When you sit down at your desk in the morning with a hot beverage, the list of things you could work on is practically limitless:

    • Write a blog post
    • Engage on social media
    • Update your personas
    • Split test an underperforming landing page
    • Draft the next email for your subscriber list
    • Check your analytics
    • Write a report for your next meeting
    • Read some of the 287 unread emails in your inbox
    • And so forth

    But if you start on one of those items, jump to the next one, rush off to a meeting, answer some emails, then start another project, and then the day is over, have you really done anything?

    Not really.

    WIP limits force you to finish something before you move on to something else, which makes them particularly useful on Agile marketing teams plagued by FOMO and ADHD and other irksome acronyms.

    What It Means to Limit Your Work in Progress

    The goal of WIP limits, and really any limitations we place on our workloads, is to stop starting and start finishing.

    By creating clearly defined limitations around how much work can be in any given state, we force ourselves to complete something before we can start something else. Let’s look at a content marketing example so you can see what I mean.

    Our hypothetical team has four members: two full time content creators, one visual content specialist, and a content marketing manager.

    Their simple workflow looks like this:

    WIP it Good - Body Image 1 - What It Means to Limit Your Work in Progress

    They’ve put WIP limits on each state their content passes through, which means if there are three pieces of content being created, as there are in the shot above, the team cannot start anything new until one of those pieces moves into the Review column.

    It’s worth noting that these are fairly tight WIP limits.

    Since there are four team members, and the board has a total WIP limit of 6 (3 Creating, 2 Review, 1 Publishing), nobody should be working on more than two things at once, with a preference for just one project at a time.

    If you’re not comfortable starting with WIPs that low, that’s totally cool. You can start with something closer to your current situation and then slowly tighten things up as you get your workload under control.

    How to Set WIP Limits

    Once you understand the basic idea behind WIP limits, the next question is obvious: how do you actually choose them?

    The first time you set WIP limits, you’re making an educated guess. That’s okay. The goal isn’t to find the perfect number on day one. The goal is to create enough constraint that the team starts noticing where work gets stuck.

    Start by looking at your current workflow and the people available to move work through it. If your marketing team has a content creation, review, and publishing process, for example, you might set different WIP limits for each of those stages based on how much work the team can realistically handle at one time.

    A good rule of thumb is to start slightly above your current comfort level, then tighten the limits over time as the team gets better at finishing work before starting more. If the limit is too loose, it won’t change much. If it’s too tight, the team may feel blocked before they understand how to work with the constraint.

    Once a WIP limit is reached, the team should treat that as a signal. Instead of pulling in more work, look for ways to move existing work forward. Can someone help review? Can a blocker be removed? Can a nearly finished asset get published? Can a lower-priority item wait?

    This is where WIP limits become more than numbers on a board. They create better conversations about capacity, priorities, bottlenecks, and how work actually moves through the team.

    Now let’s look at why those conversations matter so much for Agile marketing teams.

    Benefits of WIP Limits for Agile Marketing

    In his book Why Limit WIP: We Are Drowning in Work, Jim Benson writes, “Limiting WIP is a simple, versatile tool, resulting in people examining their work, eliminating unnecessary tasks, and finishing valuable products faster. And that’s only the beginning.”

    When we put a cap on the amount of work we’ll doing at any given time, he continues, “We optimize for throughput and quality, as opposed to utilization and politics...we are able to release more while doing less, simply because we are spending more time working and less time context-switching, politicking, status updating, and reacting to delay.”

    In addition to all of these amazing benefits, here are just three of the many Agile marketing-specific WIP limit benefits:

    1. Actually get stuff DONE so we can release it to our audiences.
    2. Build trust with those audiences by putting things out regularly.
    3. Identify bottlenecks in our workflow so we can fix them.

    WIP it Good - Body Image 2 - Benefits of WIP Limits for Agile Marketing

    Finish Work. Deliver Regularly.

    Let’s say I have a major content project that will take me 20 hours to complete, but I’m also working on three or four other projects simultaneously.

    Instead of focusing on my big project and getting it done in 2.5 days, those 20 hours get spread over several weeks as I jump back and forth among my various commitments.

    In the meantime, nothing gets delivered, and our content marketing initiatives can’t gather any steam. These frequent stalls stymie the effectiveness of a content marketing initiative particularly badly, but they affect almost any kind of marketing campaign.

    Establish Trust with Your Audience(s)

    Think back on how many blog articles you’ve read that promised to be “the first in a three-part series” that never materialized. Does that broken promise make you trust the brand that runs the blog?

    Of course not.

    And how do you think their bosses feel about it?

    Unmet deadlines and undelivered work erode audience trust, and that goes for external and internal audiences alike.

    But clear, firm, and explicit WIP limits enforce completion, allowing us to keep our agreements with our audiences (and our bosses).

    Identify Bottlenecks in the Team Flow

    Delays in delivery reduce marketing’s effectiveness and damage trust, but let’s shift our perspective and look at things from a team point of view for a moment.

    Here’s a different version of our hypothetical content team’s board:

    WIP it Good - Body Image 3 - Identify Bottlenecks in the Team Flow

    In this example their WIP limits are much higher, and the bottleneck in their current workflow is painfully obvious.

    They have eight pieces of content being created, four in review, and none in the publication process. Because their Creating and Review columns have both reached their WIP limit, no one can move a project from Creating to Review at this point, even if they finish a piece of content.

    Clearly the team needs to stop starting new content and start finishing what they’re already doing by reviewing the content that’s been created and publishing as quickly as possible.

    Only then can work resume its flow.

    Without WIP limits and visual board of some kind, it’s much harder to get this kind of insight.

    Even though nothing new is being published, everyone seems busy, so what’s a leader to do?

    WIP limits create clarity and allow us to put our joint and individual efforts toward getting stuff done.

    Before moving on to learn how to limit work in progress, why don't you take a second to grab our Agile Marketing Quick Start Guide?

    Limiting WIP on Kanban and Scrum Agile Marketing Teams

    I hope you’re on board with the beauty and power of WIP limits at this point. They’re a very nifty Agile tool, but it’s important to remember that they work a little differently depending on what kind of team you’re on.

    Before you keep reading, The Ropes gives you 100+ hours of FREE Agile marketing courses, exclusive resources, and certification & coaching giveaways — completely free.

                   

    Limiting Work-in-Progress With Scrum

    On a Scrum team, the Sprint acts as its own limiting factor. We have a set amount of time in which to work, and the team decides how much work it can complete within that timebox.

    While this doesn’t explicitly demand that team members limit their work-in-progress, the number of projects available during the Sprint will be limited by time. When we combine this with a regularly updated burndown chart the team often pushes itself to complete work steadily throughout the Sprint:

    WIP it Good - Body Image 4 - Limiting Work-in-Progress With Scrum

    If your team is scrambling at the end of every Sprint to get things done, you might consider a hybrid approach. Scrumban teams combine Sprint timeboxes with WIP limits (and other components of Kanban) to add a more explicit focus on finishing work before starting something new.

    Kanban WIP Limits

    With Kanban, you’ll set your own state-specific WIP limits. In our first example, our imaginary content team chose 3 for their Creating state, 2 for their Review state, and 1 for their publishing state.

    The first time you choose a WIP limit, you’re basically making an educated guess, so don’t worry about getting it right immediately.

    It’s best to set things a little higher than you think you should and work down, especially if you’re just getting started with an Agile approach to marketing. Lower WIP limits may slow down your flow until you get the hang of things.

    WIP Limit Mistakes Agile Marketing Teams Should Avoid 

    WIP limits are simple, but that doesn’t mean they’re always easy to use well. Like any Agile practice, they work best when the team understands why they exist and how to respond when the limits start creating tension.

    One common mistake is setting WIP limits so high that they don’t actually limit anything. If every column on your board can hold almost unlimited work, the team may still look busy without getting much closer to delivering finished marketing assets.

    The opposite can be a problem too. If WIP limits are set too low too quickly, the team may feel blocked before they understand how to collaborate around the constraint. That’s why it’s usually better to start with realistic limits and tighten them over time.

    Another mistake is treating WIP limits as optional. If the team ignores them whenever a stakeholder makes a request, the limits stop being a working agreement and become decoration on a board.

    Marketing teams should also avoid using WIP limits as a way to judge individual productivity. The point is not to catch someone with “too much” or “too little” work. The point is to improve the flow of work through the whole system.

    Finally, don’t change your WIP limits every time they feel uncomfortable. Some discomfort is useful because it shows where the team may have too much work, too many handoffs, too many interruptions, or too little capacity in a particular stage.

    Of course, even strong WIP limits will sometimes get broken. Agile marketing happens in the real world, and urgent requests, shifting priorities, and unexpected interruptions still show up. The important thing is what you do when that happens.

    Violating Your WIP Limits

    Scrum teams will sometimes end up with unplanned work that has to be incorporated into their Sprint, and Kanban teams will have extenuating circumstances that force them to violate a WIP limit.

    Agile marketing happens in the real world
    , so sometimes our pretty systems get broken by reality.

    If unplanned interruptions derail your Scrum team, be sure to document them in your burndown chart like so:

    WIP it Good - Body Image 5 - Violating Your WIP Limits
     Charts via agilenutshell.com.

    Then, in your retrospective, address the situation and decide if it warrants a change in planning your next Sprint. Should you leave more team bandwidth to deal with interruptions? Do you need to sit down with the person who brought in the interruption and explain its ramifications for the team’s output?

    Kanban teams should flag any work item that causes them to break their WIP limit so it can be discussed in a retrospective too. Was it a one-time anomaly, or does the WIP limit need an adjustment? Have you made your work-in-progress policies clear to internal stakeholders, or did the person who brought in this work ignore them?

    Whatever you do, don’t let a broken WIP limit slide by. It’s an important moment for process examination and improvement.

    Team Limits vs. Personal Limits

    It’s also worth distinguishing between team WIP limits and personal WIP limits.

    Team WIP limits control how much work can move through the system at one time. For example, a marketing team might limit the number of campaigns in planning, content pieces in creation, or assets in review. These limits help the team protect flow, expose bottlenecks, and avoid spreading everyone across too many priorities.

    Personal WIP limits control how much work one person takes on at a time. For example, a content marketer may decide not to actively write more than one long-form article at once, or a designer may limit how many creative requests they handle simultaneously.

    Both can be helpful, but team limits usually matter more because marketing work rarely moves through one person alone. Campaigns, content, launches, and creative assets usually depend on handoffs, reviews, approvals, and cross-functional input.

    If personal WIP limits help someone focus, that’s great. But if the team’s overall workflow is overloaded, individual focus can only do so much. That’s why WIP limits work best when they are treated as a shared agreement about how the team manages work, not just as a personal productivity tactic.

    WIP Limits Don’t Just Happen

    If you’re a solopreneur, freelancer, or one-person marketing machine, you’ve got a shot at making WIP limits work on your own (within a Kanban system, of course).

    If you’re on a massive HLS or BFSI marketing team, however, you’re going to need some larger structural changes to support your newfound love of limiting WIP. Jim puts it this way:

    Few workers feel they have the freedom to say “No” to any assignment given to them by a superior. Since they have no way of demonstrating that they are overloaded or need to focus on someone else’s priority, knowledge workers feel compelled to take on any work that comes their way.

    Enthusiastically, they accept this additional work because they want to do a good job and they actually care.

    This isn’t a bad thing, but if you can’t limit the incoming requests you have to deal with, your WIP limits will fail very, very quickly.

    Our environment creates ambient WIP in the form of meetings, quick status update chats with colleagues, and the neverending pings of emails and chats. Each project you’re working on multiplies those interruptions, even if you’re tightly managing your own personal WIP.

    Managers and leaders, that means it’s up to you to help your teams limit their work-in-progress. Become their protector, keep them from splitting their focus across too many projects, and their output will improve dramatically.

    WIP Limits FAQ

    What are WIP limits?

    WIP limits are rules that cap how much work can be in progress at one time. They can apply to a whole workflow, a specific stage of work, or an individual person’s active tasks. For Agile marketing teams, WIP limits help prevent too much work from being started before enough work is finished.

    What does WIP stand for?

    WIP stands for work in progress. In marketing, that could include campaigns, blog posts, landing pages, emails, creative assets, reports, experiments, or any other work that has been started but not yet completed.

    Why are WIP limits important?

    WIP limits are important because they help teams focus, reduce context switching, finish work faster, and identify bottlenecks. Instead of allowing every request to become active at once, WIP limits force teams to make clearer decisions about capacity and priorities.

    How do you set WIP limits?

    Start by looking at your workflow and the people available to move work through it. Then set realistic limits for each major stage, such as creation, review, and publishing. The first limits will be an educated guess, so inspect them regularly and adjust as the team learns how work actually flows.

    What happens when a WIP limit is reached?

    When a WIP limit is reached, the team should stop pulling new work into that stage and focus on moving existing work forward. That may mean removing a blocker, helping with review, publishing completed work, or revisiting priorities before adding more active work.

    How do WIP limits help Agile marketing teams?

    WIP limits help Agile marketing teams deliver more consistently by reducing overload and making unfinished work visible. They also help teams build trust with stakeholders and audiences because work is more likely to move through the system and reach completion.

    Do Scrum teams need WIP limits?

    Scrum teams already limit work through the Sprint, but some Scrum teams still benefit from explicit WIP limits. If work piles up in review, handoffs slow down, or the team rushes to finish everything at the end of the Sprint, WIP limits can help create steadier flow.

    What are common WIP limit mistakes?

    Common WIP limit mistakes include setting limits too high, setting them too low too quickly, ignoring them when urgent requests appear, treating them as individual productivity measures, and changing them before the team has enough evidence.

    What’s Your WIP?

    Fortunately, even with these caveats, WIP limits remain one of the easiest ways to unlock the benefits of Agile marketing without investing in things like Agile coaching or training. So, are you managing your Agile marketing workload with WIP limits? I’d love to hear what they are and how to stick to them in the comments!

    Before moving on, don't forget to get your Agile Marketing Quick Start Guide.

                   

    Topics discussed

    • marketing agility
    • Kanban
    • Agile Marketing Tools
    • Articles
    • enterprise
    • Scrumban
    • Transformation
    • Teams
    • Individuals
    • (Featured Posts)
    • Education
    Andrea Fryrear
    Andrea Fryrear

    Andrea Fryrear is a co-founder of AgileSherpas and oversees training, coaching, and consulting efforts for enterprise Agile marketing transformations.

    Improve your Marketing Ops every week

    Subscribe to our blog to get insights sent directly to your inbox.

    Subscribe Here!

    Related Posts

    Beginner's Guide to Kanban for Agile Marketing
    Getting Started
    18 min read
    Agile Marketing Teams Should be Organized Around the Customer
    marketing agility
    5 min read

    Improve your Marketing Ops every week

    Subscribe to our blog to get insights sent directly to your inbox.

    Subscribe Here!

    Accelerate Agile Adoption

    Join our free community, The Ropes, and access 100s of hours of Agile marketing education. 

    Start Learning

    Get in touch

    Are you ready to start your journey or have general questions?

    Connect
    • Resources
    • About
    • The Ropes Learning Platform
    • Solutions
    • Become a Sherpa
    symbol-on-dark
    ©2026 AgileSherpas, LLC. All rights reserved.
    • Terms & Conditions
    • Privacy Policy
    • Cookie Policy
    • LinkedIn
    • YouTube
    • Facebook